3D Printer Voron 2.4 Rev. C 350mm - Build Progress Part 8

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=zAR2NiMd_ek



Duration: 9:17
1,029 views
14


Wiring underway. I've got the tool head mounted to the Chaoticlab CNC tap and I've installed the LED lights, which run along the left and right top frame pieces.







Tags:
3D Printing
Voron 2.4