3D Printer Voron 2.4 Rev. C 350mm - Build Progress Part 13
Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=jjb28HTTFp0
Pushing plastic! All motors working, quad gantry level OK. Next step is to calibrate the extruder to make sure it's pushing the correct amount of filament out.
The toolhead wiring is currently the LDO 14 pin connector plus the additional 2 pin connector that's for the neo pixel LED's. I've decided to go with a Nitehawk-SB umbilical system. This will turn the 16 wires into 4, or 5 as the ground wire is separated into 2 wires on one end. It's basically the same thing as CAN BUS but it uses the USB protocol.
Other Videos By TomsProjects
Tags:
3D Printing
Voron 2.4
Nitehawk-SB