3D Printer Voron 2.4 Rev. C 350mm - Build Progress Part 16

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=w2Rc6-hlmC0



Duration: 7:16
252 views
4


Bottom of the printer look at some of the Nitehawk-SB installation. Still need to work out the umbilical, although I'm pretty sure I'll be going with the option that feeds it out the back of the printer next to the bowden tube.







Tags:
3D Printing
Voron
Nitehawk-SB