Train Simulator 2019: Holyhead Breakwater (Part 2) Putting The Wagons Back
Now that we have unloaded the wagons near the lighthouse, it's time to get back in the Class 03's cab and take the wagons back to the quarry. As I started the 1 in 54 climb off the breakwater, I was worried the locomotive was going to stall. Then I realised that going into third gear and keeping the locomotive on full power maintained speed at 9.9 miles per hour.
Upon arrival at the quarry, we run around the wagons again before pushing them into a siding. Then we conclude the video by driving the Class 03 back down the hill and into the shed.
Other Videos By DC 4260 Productions
Other Statistics
Train Simulator Classic Statistics For DC 4260 Productions
At this time, DC 4260 Productions has 692,518 views for Train Simulator Classic spread across 771 videos. The game makes up over 14 days of published video on his channel, or 39.39% of the total watchable video for Train Simulator Classic on DC 4260 Productions's YouTube channel.