3D Printed R2D2 - Part 102
Michael Baddeley R2D2 files:
https://www.patreon.com/mrbaddeley
Astromech web site, information on all aspects of droid building (membership required to view but it's worth it for the vast amount of information available):
http://astromech.net/
First power on resulted with R2 moving forward/back when I moved the joystick on the controller left/right. I cut out the couple minutes of me swapping both pairs of wires. Second power on R2 now moves forward/backward correctly but the left/right turning is reversed. I will change a parameter in the Shadow MD code for the Arduino Mega 2560 to correct that. I'm not sure when I'll do it, as it means I have to assemble him again to verify the fix since I took him apart again to get him inside the house.
The dome turns the opposite of the way it should but I'm not sure if I should change that (swap the wires on the Syren) or if I should leave it as it makes it more intuitive to change the dome direction when looking at him from the front.
Hopefully the video comes out OK. I was having some editing (OK, editor) issues. I'll repost it later if it's messed up.
Other Videos By TomsProjects
2023-07-25 | 1000 Subscribers! Thanks to all! |
2023-06-14 | Joust Cocktail - Part 7 |
2023-05-30 | 3D Printed R2D2 - Part 104 |
2023-05-13 | Joust Cocktail - Part 6 |
2023-05-13 | Joust Cocktail - Part 5 |
2023-05-04 | 3D Printed R2D2 - Part 103 |
2023-05-04 | Joust Cocktail - Part 4 |
2023-04-24 | Joust Cocktail - Part 3 |
2023-04-24 | Joust Cocktail - Part 1 |
2023-04-24 | Joust Cocktail - Part 2 |
2023-04-13 | 3D Printed R2D2 - Part 102 |
2023-04-13 | 3D Printed R2D2 - Part 101 |
2023-04-11 | 3D Printed R2D2 - Part 100 |
2023-04-04 | 3D Printed R2D2 - Part 99 |
2023-04-04 | 3D Printed R2D2 - Part 98 |
2023-03-28 | 3D Printed R2D2 - Part 97 |
2023-03-26 | 3D Printed R2D2 - Part 96 |
2023-03-26 | 3D Printed R2D2 - Part 95 |
2023-03-15 | 3D Printed R2D2 - Part 94 |
2023-03-15 | Remains - PC game on Steam - early access |
2023-03-08 | 3D Printed R2D2 - Part 93 |